Parking lots, driveways, sidewalks

Parking lots, driveways, sidewalks

When carrying out any external investment, it is almost always necessary to take into account the hardening of the surface. Regardless of whether it will be a parking lot, road, driveway or sidewalk, without these elements, it will not be possible to use the facility. The most commonly used materials are concrete and stone or asphalt. Regardless of the type of surface, it is necessary to build a foundation suitable for the load and traffic intensity. Without it, the paved surface will deteriorate very quickly.

Foundation and hardening of the site

Substructures are a key element responsible for the even transfer of loads to the ground caused by pedestrian traffic on sidewalks, cyclist traffic on bicycle paths and vehicle traffic in parking lots, roads and streets. That is why the foundation is properly adjusted, designed and made with the use of appropriate equipment and with the use of good quality material. Only then will it ensure the required degree of compaction and bearing capacity. Thanks to qualified specialists, the substructure prepared by us will meet the requirements and will provide ideal conditions for laying subsequent closing structural layers. We design and make structures tailored to the needs of a given task. We make substructures of various fractions and materials tailored to ready-made design assumptions or we propose them ourselves based on catalogs and guidelines.

concrete stairs < / p>

Concrete and stone pavements

After the appropriate foundation is made, the surface can be made. Concrete paving stones are most often used, often with an additional layer imitating stone or granite. This solution is much cheaper compared to stone materials, and often does not differ visually from their appearance. The paving stones, just like the foundation, should be selected depending on the conditions and requirements that the surface must meet. Home sidewalks, which will only be used for walking, can be made of cubes 3-4 cm thick, but those in public spaces near roads must be more durable, therefore the thickness should be at least 6 cm. For roads and streets, use a cube that is at least 8 cm thick. Regular (cut) or irregular solid stone materials are a more durable, but more expensive solution, which is much more time-consuming to install.

ramps place

Execution of the surface

At first glance, it can be said that the execution of the surface, especially with small elements, is not too complicated. However, the lack of appropriate knowledge, and especially of the machines, may cause the paved surface to undulate very quickly and not fulfill its role properly. Basic tools can be hired, but if we count the cost of such a service, it may turn out that it is better to use the services of specialists who have much more experience, knowledge and all the necessary machinery and equipment to make the road, pavement or driveway. < / p>

Kobesport: we make squares, pavements, roads, driveways.

We have a wide range of equipment needed to perform paving and preparatory works. Thanks to excavators and compactors, we will prepare the ground properly, and our trucks will provide material for the construction site and transport unnecessary spoil. Thanks to many years of experience, we can make every sidewalk, parking lot, driveway from design to finishing works. If you need a specialist fill out the contact form or call and arrange to speak to a specialist.